Texas Instruments BOOSTXL-TLC2543 Evaluation Kit
Texas Instruments BOOSTXL-TLC2543 Evaluation Kit offers 11 analog inputs and a 12-bit ADC with serial control to evaluate the TLC2453-Q1. The TLC2453-Q1 BoosterPack™ Board is included in the BOOSTXL-TLC2543 Kit as well as PC software enabling the user to configure the ADC, capture data, and perform data analysis. No external power supply is needed. The device is powered by USB.Features
- Includes hardware and software required for testing and evaluation of TLC2453-Q1 SAR ADC
- USB powered; no external power supply required
- Easy-to-use evaluation software for Microsoft® Windows® 7/8/10 64-bit operating systems
- Uses EK-TM4C1294XL LaunchPad™ development kit (not included) that provides a convenient communication interface to TLC2543-Q1 ADC over a USB for power delivery, as well as digital input and output
Top Overview
Block Diagram
Yayınlandı: 2018-09-21