Texas Instruments bq79616EVM-021 Battery Monitor Evaluation Module

Texas Instruments bq79616EVM-021 Battery Monitor Evaluation Module (EVM) is an evaluation board for the bq79616-Q1. The bq79616-Q1 provides high accuracy channel measurements for six to sixteen battery cells. With the inclusion of a daisy chain communication port, the Texas Instruments bq79616-Q1 device is stackable (up to 35 devices) to support large stack configurations found in battery packs for electrified automotive drive trains.

Features

  • Highly accurate monitoring of 16 li-ion cells
  • Integrated protector
  • Internal cell balancing
  • 1Mb/s stackable isolated differential-UART
  • ASIL-D voltage/temperature/communication

Kit Contents

  • bq79616EVM evaluation module
  • SFI 23/18 twisted pair communication cable

Board Setup

Mechanical Drawing - Texas Instruments bq79616EVM-021 Battery Monitor Evaluation Module
Yayınlandı: 2021-01-13 | Güncellenmiş: 2022-03-11