Texas Instruments DRV2510Q1EVM Haptic Driver Evaluation Module

Texas Instruments DRV2510Q1EVM Haptic Driver Evaluation Module (EVM) is designed to help evaluate the performance of the DRV52510-Q1. The evaluation module allows a designer to assess the device with a driver alone or connected to target actuators such as a solenoid. This feature enables the designer to easily and quickly evaluate the driver's performance or the actuator in-use conditions. The Texas Instruments DRV2510Q1EVM Haptic Driver Evaluation Module is AEC-Q100 qualified for automotive applications.

Features

  • MSP430 MCU
  • Onboard EEPROM
  • Selectable external analog inputs or preloaded/customizable PWM waveforms
  • EMC Filter
  • High output current capable of 3A peak
  • Integrated diagnostics
  • I2C communication of device status and system conditions
  • Wide operating voltage range of 4.5V – 18V
  • Small footprint (70mm × 75mm)

Kit Contents

  • DRV2510Q1EVM evaluation board
  • Firmware preloaded onto onboard EEPROM
  • Downloadable Haptics Control Console to control EVM
  • Micro USB cable

Block Diagram

Block Diagram - Texas Instruments DRV2510Q1EVM Haptic Driver Evaluation Module
Yayınlandı: 2017-02-28 | Güncellenmiş: 2025-03-05