Texas Instruments INA-DUAL-2AMP-EVM INA Evaluation Module (EVM)
Texas Instruments INA-DUAL-2AMP-EVM INA Evaluation Module (EVM) is compatible with various dual-channel two-amp instrumentation amplifiers (INAs). This evaluation module is compatible with the SOIC-16 (D) and SOIC-16 (DW) INA packages. The Texas Instruments INA-DUAL-2AMP-EVM is designed to evaluate the performance of the devices in both single-supply and dual-supply configurations.Features
- Intuitive evaluation
- Easy access to nodes with surface-mount test points
- Reference voltage source flexibility
- Convenient input and output filtering
Board Layout
Yayınlandı: 2022-02-15
| Güncellenmiş: 2022-03-15
