Texas Instruments LP8866EVM Evaluation Module

Texas Instruments LP8866EVM Evaluation Module evaluates the characteristics, operation, and performance of the LP8866(S)-Q1 device. The LP8866(S)-Q1 is a 6-channel high-efficiency LED driver for automotive display LED backlighting. The LP8866(S)-Q1 device integrates a boost or SEPIC controller and six high-precision current sinks.

The Texas Instruments LP8866EVM Evaluation Module features an up to 48V Vout boost controller and six high-precision current sinks. The evaluation module supports built-in phase-shift PWM dimming, hybrid dimming, current dimming, and direct PWM dimming mode.

Features

  • Input voltage range 3V to 48V
  • Up to 48V Vout boost controller
  • Six high-precision current sinks
  • Extensive fault diagnostics
  • Supports built-in phase-shift PWM dimming, hybrid dimming, current dimming, and direct PWM dimming mode
  • LED brightness is controlled globally through an I2C interface or PWM input

Kit Contents

  • USB2ANY
    • Ribbon cable
    • USB cable
  • LP8866EVM
  • LP886X-LEDLOAD-EVM

Required Equipment

  • DC power supply: 24V or higher, 6A or higher
  • LED cable: 7-position ribbon cable
  • PC to run GUI software
  • GUI software

Applications

  • Automotive infotainment
  • Automotive instrument clusters
  • Smart mirrors
  • Heads-Up Displays (HUD)
  • Central Information Displays (CID)
  • Audio-Video Navigation (AVN)

Layout

Texas Instruments LP8866EVM Evaluation Module

Hardware Setup

Texas Instruments LP8866EVM Evaluation Module
Yayınlandı: 2019-12-27 | Güncellenmiş: 2024-02-21