Texas Instruments TPS543521EVM Evaluation Module

Texas Instruments TPS543521EVM Evaluation Module is a completely assembled and tested circuit demonstrating the TPS543521 converter. The TPS543521 are high-efficiency, high-voltage input, easy-to-use synchronous buck converters with high design flexibility.

The TI TPS543521EVM is constructed to operate from an input voltage range of 3.8V to 18V and deliver a regulated 5.0V output with up to 5A load current. Most settings of the device, such as operation mode, soft-start time, and switching frequency, can be easily adjusted or set via jumpers.

Features

  • 3.8V to 18V input voltage range
  • Selectable Eco-mode and forced continuous conduction modulation (FCCM) mode
  • Support 5A continuous output current
  • Adjustable switching frequency
  • Easy to use and small design size

Applications

  • Medical and healthcare, building automation, test and measurement
  • Multifunction printers and enterprise projectors
  • Portable electronics and connected peripherals
  • Wired networking and wireless infrastructure

Kit Contents

  • TPS543521EVM circuit board
  • EVM disclaimer Read Me
  • Prototype EVM disclaimer Read Me

Test Setup

Location Circuit - Texas Instruments TPS543521EVM Evaluation Module

Layout

Texas Instruments TPS543521EVM Evaluation Module
Yayınlandı: 2025-05-29 | Güncellenmiş: 2025-06-05