Texas Instruments TPS7H500xEVM Evaluation Modules
Texas Instruments TPS7H500xEVM Evaluation Modules demonstrate how the TPS7H500x-SEP controller can be operated in an open loop and supports a test platform to operate the product. The evaluation modules feature synchronous rectification outputs with adjustable dead time and a configurable duty-cycle limit. The TI TPS7H500xEVM Evaluation Modules are ideal for space satellite isolated power supplies.Features
- Synchronous rectification outputs with adjustable dead time
- Adjustable slope compensation and soft start
- Configurable duty-cycle limit
- 0.613V ±1% voltage-reference overtemperature, radiation, and line and load
Applications
- Space satellite isolated power supplies
- Radiation hardened applications
- Space satellite payloads
Overlay
Yayınlandı: 2022-03-30
| Güncellenmiş: 2022-06-15